|
Beijing
Subway construction started in China's capital in 1965. The first stretch, which opened between the city's railway station and Pingguoyuan, included today's western branch of Line 1 and the southern part of Line 2. In 1987, the circular line was finished (16 km) and both lines started operating separately. In the 1990's an eastern extension of Line 1 was built, the so-called Fu Ba Line, to Sihuidong opened for trial in Oct. 1999 for the People's Republic's 50th anniversary. The new section (13.5 km) was eventually connected to the western section of Line 1 on 24 June 2000 which had been upgraded to ATO operation. January 2003.
|
|